OPERATIONS
Frac plugs were umped downhole, and set in the vertical section of each well. After setting, the ball was dropped. The ball took under 5 minutes to seat. Pressure was increased to 1,500 psi and held for ~150 minutes with no increase in water used or pressure drop. This verifies that the plug both held position without slipping and effectively isolated the zone. Pressure was incrementally increased to 9,000 psi and held for ~30 minutes. When pressure reached 7,250 psi, total barrels pumped plateaued and did not increase, verifying that the plug effectively held pressure and maintained position.
After the test, the plug was easily milled out
WELL PROFILE
Oil well
STACK Formation MD 18,686 Ft
39 stages
11,500 psi
2% KCL
CHALLENGES
Other DFPs slipping or skidding
RESULTS
Plug 1 set in Well 1
Plug 2 set in Well 2
Both held pressure and position
Ball took less than 5 minutes to seat