Fully Dissolution in High Pressure Shale Gas Application

Classic Cases > Dissolvable Solutions > Fully Dissolution in High Pressure Shale Gas Application

Fully Dissolution in High Pressure Shale Gas Application

ThunderCloud™ PROVES ITS RELIABILITY IN 31 STAGE FRAC OPERATION
CHONGQING, SOUTHWEST, CHINA

OPERATIONS

30 ThunderCloud™ plugs tripped in, set and seated smoothly with no issues.

Wiper trip conducted 14 days later verified that all plugs dissolved completely.

WELL PROFILE

Shale Gas

MD 18,608 Ft TVD 10,006 Ft

7,545 Ft Hor. Interval 5-1/2” 26.8# Csg.

DHT 230°F

Formation Fluid CL- 15,000mg/l 13,488 psi rated

CHALLENGES

31 stages and high pumping pressure require the most reliable dissolvable frac plugs

SOLUTIONS

ThunderCloud™ Dual slips design that withstand higher pumping pressure recommended

RESULTS

Plugs Set Ball Seated with no issues

Pressure held up when fracturing

Complete dissolution confirmed by wiper trip conducted 14 days later