OPERATIONS
6 ThunderCloud™ UHT plugs were set, setting tools was released, packer set and balled seated without any issues, pressure was holding as planned and plugs dissolvable as designed. The operation went smoothly and all objectives achieved successfully. ThunderCloud™ UHT is the industry’s first DFP to withstand such ultra-high downhole temperature.
WELL PROFILE
Oil well
MD 16,174 Ft TVD 13,451 Ft
2,060 Ft Hor. Interval 5” 21.4# Csg.
DHT 347°F
Formation Fluid CL- >100,000mg/l CHALLENGES
347°F Ultra-High Temperature High Pressure downhole
10% HCL lead acid pumped for each stage
SOLUTIONS
Innovative UHT Series that work at 365°F
Special coating to prevent premature dissolution
RESULTS
Packer Set and Ball Seated with no issues
Pressure held up when fracturing
Complete dissolution confirmed by wiper trip conducted 20 days later